Get in touch

Unlike most organisations our size, our board of directors are always on the end of the phone for our clients.

Give us a call on 0207 593 9900 or get in touch on the form below.

Get directions.

Technologically Advanced

Throughout, we worked closely with Win’s team to adapt to shifting needs, resolve interface and AV challenges through off-site testing, and maintain quality through early snagging and benchmark setting.

The result? A confident, high-performing space that reflects who Win Technologies are: agile, open, and built for what’s next.

Win Technologies HQ Built for focus, flow and flexibility

The Project 

Win Technologies, part of global gaming group Super Group, needed a new home that could bring their London teams together – and keep pace with rapid growth.

Their new HQ at St Pancras Campus spans three floors and is designed around what their people actually need: space to collaborate, focus, move, and reset. From high-spec meeting rooms and quiet zones to an arcade, gym, and a speakeasy bar – every detail was thought through with purpose.

  • Project Manager: Blackburn & Co
  • Architect: Basha Franklin
  • Structural Engineers: AKTII
  • M&E: Norman Disney & Young
  • Quantity Surveyor: Exigere

Standout Features

Two standout staircases – one sweeping, one structural – connect the space, physically and socially. They were technically complex, but early coordination and hands-on workshops meant no surprises during delivery.

BW were first on site after base build, stepping in with clarity and focus. When key details were missing or misaligned, we brought everyone together – consultants, client, subcontractors – to solve problems fast and keep the project moving.

Take a look at some
more of our work